Sign Up to like & get
recommendations!
0
Published in 2017 at "TOP"
DOI: 10.1007/s11750-016-0415-2
Abstract: This study emphasizes that project scheduling and material ordering (time and quantity of an order) must be considered simultaneously to minimize the total cost, as setting the material ordering decisions after the project scheduling phase…
read more here.
Keywords:
project;
material ordering;
multi mode;
bonus ... See more keywords