Sign Up to like & get
recommendations!
0
Published in 2024 at "Engineering Optimization"
DOI: 10.1080/0305215x.2024.2423188
Abstract: ABSTRACT The scheduling optimization of prefabricated concrete components (PCs) production is one key part of an assembled construction project. Most research neglected to investigate the batch production of PCs and failed to make full use…
read more here.
Keywords:
optimization;
batch production;
mold tables;
production ... See more keywords