Articles with "multi project" as a keyword



Photo by felix_kolthoff from unsplash

A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems

Sign Up to like & get
recommendations!
Published in 2020 at "Operational Research"

DOI: 10.1007/s12351-017-0358-x

Abstract: Recent literature on multi-project scheduling problems has been focused on the transfer of available resources between project activities, especially in decentralized projects. Determining the right location for storage facilities where resources are moved between activities… read more here.

Keywords: project; project scheduling; location; multi project ... See more keywords
Photo by hollymindrup from unsplash

Solving the resource-constrained multi-project scheduling problem with an improved critical chain method

Sign Up to like & get
recommendations!
Published in 2020 at "Journal of the Operational Research Society"

DOI: 10.1080/01605682.2019.1609883

Abstract: Abstract In view of the fact that the critical chain method (CCM) is mainly used in single project scheduling, this article improves the method and applies it to multi-project scheduling. Taking into consideration the flow… read more here.

Keywords: project; critical chain; resource; project scheduling ... See more keywords
Photo by hnhmarketing from unsplash

Proactive and Reactive Multi-Project Scheduling in Uncertain Environment

Sign Up to like & get
recommendations!
Published in 2019 at "IEEE Access"

DOI: 10.1109/access.2019.2926337

Abstract: In this paper, a proactive and reactive multi-project scheduling problem is addressed. This problem is related to the influences of uncertain factors, which leads to a deviation between actual scheduling and baseline scheduling, and a… read more here.

Keywords: project scheduling; reactive multi; multi project; proactive reactive ... See more keywords
Photo by hnhmarketing from unsplash

A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff

Sign Up to like & get
recommendations!
Published in 2023 at "IEEE Access"

DOI: 10.1109/access.2023.3261139

Abstract: In practical multi-skilled resource-constrained multi-project management, the activity duration is often affected by some factors (e.g., rework, increased workload), leading to uncertainty. Moreover, multiple projects are often managed under a distributed decision-making environment. To deal… read more here.

Keywords: multi skilled; multi project; multi; stage ... See more keywords
Photo by hnhmarketing from unsplash

Integrated Multi-Project Scheduling and Hierarchical Workforce Allocation in the ETO Assembly Process

Sign Up to like & get
recommendations!
Published in 2019 at "Applied Sciences"

DOI: 10.3390/app9050885

Abstract: The engineer-to-order (ETO) production strategy plays an important role in today’s manufacturing industry. This paper studies integrated multi-project scheduling and hierarchical workforce allocation in the assembly process of ETO products. The multi-project scheduling problem involves… read more here.

Keywords: project; eto; project scheduling; multi project ... See more keywords