Sign Up to like & get
recommendations!
1
Published in 2020 at "Indian Geotechnical Journal"
DOI: 10.1007/s40098-020-00449-9
Abstract: APDPPL has constructed a coal terminal at Dahej, India. The 670-m off-shore jetty head is connected to land with 1170-m pile-supported trestle followed by 1200-m rubble mounted bund. The original plan was to construct the…
read more here.
Keywords:
pipe piles;
analysis;
dahej;
steel ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2019 at "Construction and Building Materials"
DOI: 10.1016/j.conbuildmat.2019.03.166
Abstract: Abstract Effects of two different curing regimes (steam curing and autoclaved curing) on durability of pre-stressed high-strength concrete (PHC) pipe piles with fly ash (FA) had been investigated. The chloride penetration, salt and frost resistance…
read more here.
Keywords:
phc pipe;
pipe piles;
steam cured;
Sign Up to like & get
recommendations!
0
Published in 2020 at "Interpretation"
DOI: 10.1190/int-2020-0057.1
Abstract: Due to poor geologic conditions, unreasonable design principles, or construction method, many quality defects often occur during prestressed pipe piles’ field construction, which will greatly influence pipe piles’ normal service or result in engineering accident.…
read more here.
Keywords:
treatment measures;
pipe piles;
bearing capacity;
pipe ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2024 at "Buildings"
DOI: 10.3390/buildings14020489
Abstract: In order to improve the weak impact resistance of non-autoclaved concrete pipe piles, this study replaced sand in the concrete with rubber particles of different volume contents to obtain rubber-modified non-autoclaved concrete pipe piles (with…
read more here.
Keywords:
autoclaved concrete;
damage;
impact;
pipe piles ... See more keywords