Sign Up to like & get
recommendations!
1
Published in 2017 at "Engineering Geology"
DOI: 10.1016/j.enggeo.2016.11.023
Abstract: Abstract In this note a procedure for a back-of-the-envelope estimation of the correct length of a single-shielded TBM is reported in the context of a TBM preliminary design phase. It is based on four Decision…
read more here.
Keywords:
decision plots;
plots preliminary;
design single;
preliminary design ... See more keywords