Articles with "problem total" as a keyword



Photo by sevcovic23 from unsplash

Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study

Sign Up to like & get
recommendations!
Published in 2019 at "Engineering Optimization"

DOI: 10.1080/0305215x.2018.1485903

Abstract: ABSTRACT In this article, the impact of preventive maintenance policies on the constructive heuristics performance for the no-wait flow-shop problem with total flow-time minimization is evaluated. The main constructive heuristics for the m-machine no-wait flow-shop… read more here.

Keywords: flow shop; total flow; wait flow; flow time ... See more keywords