Sign Up to like & get
recommendations!
1
Published in 2017 at "Economic Theory"
DOI: 10.1007/s00199-015-0939-y
Abstract: We calibrate the cost of sovereign defaults using a continuous time model, where government default decisions may trigger a change in the regime of a stochastic TFP process. We calibrate the model to a sample…
read more here.
Keywords:
cost sovereign;
productivity cost;
debt;
default ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2018 at "Journal of forest science"
DOI: 10.17221/51/2012-jfs
Abstract: The Bruks mobile chipper was tested for chipping extracted non-merchantable stemwood at the road- side in Pine plantation in Victoria. The elemental time study method was used to evaluate the system productivity. The productivity, cost,…
read more here.
Keywords:
mobile chipper;
productivity;
productivity cost;
chip quality ... See more keywords
Sign Up to like & get
recommendations!
3
Published in 2023 at "Croatian journal of forest engineering"
DOI: 10.5552/crojfe.2023.2245
Abstract: Salvage harvesting is common in the US South following natural disasters such as tornadoes and hurricanes; nevertheless, few studies have evaluated the productivity and costs of these harvests because of their geographic dispersion and the…
read more here.
Keywords:
salvage;
sized stands;
south carolina;
salvage harvesting ... See more keywords