Articles with "sample losses" as a keyword



Photo from wikipedia

Multirate control strategies for avoiding sample losses. Application to UGV path tracking.

Sign Up to like & get
recommendations!
Published in 2020 at "ISA transactions"

DOI: 10.1016/j.isatra.2020.01.025

Abstract: When in a digital control strategy there are samples lost due to limitations, different multirate (MR) control options can be used for solving the problem: Dual-rate inferential control (IC) and model-based dual-rate control (MBDR). The… read more here.

Keywords: ugv path; dual rate; control; multirate control ... See more keywords