Sign Up to like & get
recommendations!
0
Published in 2017 at "Journal of Cleaner Production"
DOI: 10.1016/j.jclepro.2017.07.156
Abstract: Abstract With its generally recognized benefits of clean and safe working environment and good quality, prefabricated house construction (PHC) as a solution is gaining momentum in the face of various housing challenges in Hong Kong's…
read more here.
Keywords:
construction;
schedule;
prefabricated house;
schedule performance ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2019 at "Journal of Legal Affairs and Dispute Resolution in Engineering and Construction"
DOI: 10.1061/(asce)la.1943-4170.0000311
Abstract: AbstractFew studies have been conducted to evaluate change orders in design-build (DB) projects, examining their impacts on cost and schedule performance, and their relationship with project size. ...
read more here.
Keywords:
schedule performance;
project size;
change orders;
cost schedule ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2020 at "Journal of Legal Affairs and Dispute Resolution in Engineering and Construction"
DOI: 10.1061/(asce)la.1943-4170.0000353
Abstract: AbstractAccording to previous studies, change orders in general lead to delays in design-bid-build (DBB) projects. However, none of the studies have determined such a relationship in design-build (...
read more here.
Keywords:
performance design;
change orders;
orders schedule;
schedule performance ... See more keywords
Sign Up to like & get
recommendations!
2
Published in 2022 at "Engineering, Construction and Architectural Management"
DOI: 10.1108/ecam-10-2021-0852
Abstract: PurposeThe purpose of this study is to determine whether there is a correlation between mobilization costs and project schedule performance of highway projects. In addition to this, the study will also determine if the mobilization…
read more here.
Keywords:
schedule performance;
highway projects;
mobilization costs;
mobilization ... See more keywords