Sign Up to like & get
recommendations!
0
Published in 2017 at "Journal of Intelligent Manufacturing"
DOI: 10.1007/s10845-015-1069-x
Abstract: A multi-agent based system is proposed to simultaneous scheduling of flexible machine groups and material handling system working under a manufacturing dynamic environment. The proposed model is designed by means of $$\hbox {Prometheus}^{\mathrm{TM}}$$PrometheusTM methodology and…
read more here.
Keywords:
agent;
system;
scheduling flexible;
multi agent ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2017 at "IFAC-PapersOnLine"
DOI: 10.1016/j.ifacol.2017.08.2056
Abstract: Abstract Optimal scheduling in industrial processes is crucial to ensure highest throughput rates and low costs. This paper presents the implementation of a scheduling algorithm in a hot rolling mill, which features several reheating furnaces…
read more here.
Keywords:
blocking wait;
scheduling flexible;
wait constraints;
efficient algorithm ... See more keywords