Sign Up to like & get
recommendations!
2
Published in 2021 at "Engineering Geology"
DOI: 10.1016/j.enggeo.2021.106036
Abstract: Abstract The third set of locks of the Panama Canal is one the most impressive civil infrastructures in the world. Its construction, however, was delayed by two years incurring cost overruns in billions that were…
read more here.
Keywords:
panama canal;
set locks;
third set;
construction ... See more keywords