Sign Up to like & get
recommendations!
0
Published in 2020 at "Arabian Journal for Science and Engineering"
DOI: 10.1007/s13369-020-04759-1
Abstract: This paper focuses on a make-to-order production system, where rejection of some orders is inevitable due to limited production capacity. In such a system, accepting all orders may cause overloads, order delays, and customer dissatisfaction.…
read more here.
Keywords:
release date;
order;
time;
setup time ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2017 at "Advances in Mechanical Engineering"
DOI: 10.1177/1687814017698887
Abstract: This article studies a scheduling problem of a two-machine flow shop with both time-dependent deteriorating jobs and sequence-independent setup time. It is assumed that the deterioration of processing time and setup time is of a…
read more here.
Keywords:
two machine;
flow shop;
total completion;
time ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2021 at "Symmetry"
DOI: 10.3390/sym13091574
Abstract: Unrelated parallel machine scheduling problems (UPMSP) with various processing constraints have been considered fully; however, a UPMSP with deteriorating preventive maintenance (PM) and sequence-dependent setup time (SDST) is seldom considered. In this study, a new…
read more here.
Keywords:
parallel machine;
machine scheduling;
unrelated parallel;
frog leaping ... See more keywords