Sign Up to like & get
recommendations!
0
Published in 2018 at "Journal of rock mechanics and geotechnical engineering"
DOI: 10.1016/j.jrmge.2017.12.002
Abstract: Abstract Norwegian hydropower industry has more than 100 years of experiences in constructing more than 4000 km-long unlined pressure shafts and tunnels with maximum static head of 1047 m (equivalent to almost 10.5 MPa) reached at unlined pressure…
read more here.
Keywords:
shafts tunnels;
unlined pressure;
shaft tunnel;
pressure shafts ... See more keywords