Published in 2020 at "IEEE Transactions on Software Engineering"
DOI: 10.1093/tse/tdaa028
Abstract: In order to study the shield construction under an existing highway, the initial displacement and the excess pore water pressure solution from Biot consolidation equation were used to derive the analytical solutions of the vertical…
read more here.
Keywords:
construction existing;
shield construction;
saturated soil;
water pressure ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2022 at "Journal of Environmental and Public Health"
DOI: 10.1155/2022/1666950
Abstract: Slurry balancing shield construction is a method in which slurry pressure and groundwater pressure are balanced to achieve stability of excavation working face. It is widely used in tunnel construction due to its safety and…
read more here.
Keywords:
risk;
shield construction;
construction;
slurry balancing ... See more keywords