Sign Up to like & get
recommendations!
0
Published in 2020 at "Construction and Building Materials"
DOI: 10.1016/j.conbuildmat.2020.118314
Abstract: Abstract The performance of the prefabricated concrete (PC) structures at elevated temperature becomes an important focus, once a fire occurs. The failure in fire of fully-grouted sleeve connection (FGSC) that extensively used in PC members…
read more here.
Keywords:
connection;
fully grouted;
grouted sleeve;
sleeve connection ... See more keywords