Published in 2017 at "Journal of Infrastructure Systems"
DOI: 10.1061/(asce)is.1943-555x.0000335
Abstract: AbstractTo reduce disruption to traffic during bridge replacement, accelerated bridge replacement (ABR) methodologies are being developed. One of the ABR methodologies being implemented is slide-in bridge construction (SIBC), which reduces the total duration of traffic…