Articles with "synchronous grouting" as a keyword



The behavior of synchronous grouting in a quasi-rectangular shield tunnel based on a large visualized model test

Sign Up to like & get
recommendations!
Published in 2019 at "Tunnelling and Underground Space Technology"

DOI: 10.1016/j.tust.2018.10.006

Abstract: Abstract A quasi-rectangular shield tunnel can increase the effective usage area and decrease the degree of adverse impact from the surrounding environment relative to that of a circular shield tunnel. Synchronous grouting in a quasi-rectangular… read more here.

Keywords: tunnel; synchronous grouting; rectangular shield; quasi rectangular ... See more keywords

Calculation of shield tunnel uplift induced by synchronous grouting

Sign Up to like & get
recommendations!
Published in 2025 at "Scientific Reports"

DOI: 10.1038/s41598-025-23716-2

Abstract: This paper analyzes the combined effects of grout properties (mix ratio, viscosity), construction speed, grouting pressure, bolt preload, and tunnel slope on shield tunnel uplift induced by synchronous grouting. A finite-difference model incorporating 12 consecutive… read more here.

Keywords: shield tunnel; tunnel uplift; synchronous grouting; uplift induced ... See more keywords

Optimisation of Synchronous Grouting Mix Ratio for Shield Tunnels

Sign Up to like & get
recommendations!
Published in 2024 at "Applied Sciences"

DOI: 10.3390/app14104098

Abstract: During shield construction in underground spaces, synchronous grouting slurry is poured between the surrounding rock and tunnel lining to ensure stability. For synchronous grouting slurries, few studies have investigated the relationship between the rheological parameters… read more here.

Keywords: segregation; rate; synchronous grouting; mix ratio ... See more keywords

Experimental Investigation of Synchronous Grouting Material Prepared with Different Mineral Admixtures

Sign Up to like & get
recommendations!
Published in 2022 at "Materials"

DOI: 10.3390/ma15031260

Abstract: Waste sediment generated during tunnel construction is applied to prepare synchronous grouting material, where the influences of fly ash, slag powder, and bentonite on the rheological properties (such as consistency, fluidity, setting time, drainage rate,… read more here.

Keywords: setting time; material; grouting material; rate ... See more keywords