Articles with "tardiness electricity" as a keyword



Photo by fresonneveld from unsplash

Bi-criteria parallel batch machine scheduling to minimize total weighted tardiness and electricity cost

Sign Up to like & get
recommendations!
Published in 2020 at "Journal of Business Economics"

DOI: 10.1007/s11573-020-00970-6

Abstract: A bi-criteria scheduling problem for parallel identical batch processing machines in semiconductor wafer fabrication facilities is studied. Only jobs belonging to the same family can be batched together. The performance measures are the total weighted… read more here.

Keywords: tardiness electricity; batch; total weighted; electricity cost ... See more keywords