Articles with "total project" as a keyword



Photo by ry4nolson from unsplash

Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm

Sign Up to like & get
recommendations!
Published in 2017 at "Journal of Natural Gas Science and Engineering"

DOI: 10.1016/j.jngse.2017.04.033

Abstract: Abstract Stochastic time-cost-quality tradeoff problem (STCQTP) analysis significantly expands the scope of discrete (deterministic) project duration-cost analysis. STCQTP requires multi-objective optimization methodologies to locate optimum total-project-cost-quality solutions for facilities-construction projects with multiple parallel pathways of… read more here.

Keywords: project; duration; total project; cost ... See more keywords