Sign Up to like & get
recommendations!
0
Published in 2017 at "Journal of Natural Gas Science and Engineering"
DOI: 10.1016/j.jngse.2017.04.033
Abstract: Abstract Stochastic time-cost-quality tradeoff problem (STCQTP) analysis significantly expands the scope of discrete (deterministic) project duration-cost analysis. STCQTP requires multi-objective optimization methodologies to locate optimum total-project-cost-quality solutions for facilities-construction projects with multiple parallel pathways of…
read more here.
Keywords:
project;
duration;
total project;
cost ... See more keywords