Sign Up to like & get
recommendations!
0
Published in 2019 at "Flow Measurement and Instrumentation"
DOI: 10.1016/j.flowmeasinst.2019.101583
Abstract: Abstract Tucurui hydro power plant was constructed with two tailraces referring to phases I and II. The bed of the tailrace related to phase II has a high bank and a curvature oriented towards the…
read more here.
Keywords:
doppler profiler;
acoustic doppler;
hydro power;
tucurui hydro ... See more keywords