Sign Up to like & get
recommendations!
1
Published in 2020 at "Bulletin of Engineering Geology and the Environment"
DOI: 10.1007/s10064-020-01947-z
Abstract: In this paper, after a brief description of engineering geological properties of Ghomrood water conveyance tunnel project (lots 3 and 4 with a total length of 18 km), the actual performance of the machine during the…
read more here.
Keywords:
water conveyance;
tunnel;
tunnel project;
ghomrood water ... See more keywords