Articles with "unrelated parallel" as a keyword



Photo by howardbouchevereau from unsplash

A worm optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times

Sign Up to like & get
recommendations!
Published in 2020 at "Annals of Operations Research"

DOI: 10.1007/s10479-019-03138-w

Abstract: This paper addresses the unrelated parallel machine scheduling problem with setup times, with an objective of minimizing the makespan. The machines are unrelated in the sense that the processing speed depends on the job being… read more here.

Keywords: worm optimization; dependent setup; setup times; unrelated parallel ... See more keywords
Photo from wikipedia

Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs

Sign Up to like & get
recommendations!
Published in 2020 at "Journal of Cleaner Production"

DOI: 10.1016/j.jclepro.2019.119393

Abstract: Abstract The extensive use of energy worldwide, as well as a reduction in non-renewable energy sources, has led to increased greenhouse gas emissions and global warming. Therefore, the optimal use of energy has recently become… read more here.

Keywords: parallel machine; use; energy; unrelated parallel ... See more keywords
Photo from wikipedia

An Enhanced Adaptive Large Neighborhood Search for Unrelated Parallel Machine Scheduling With Sequence Dependent Setup Times

Sign Up to like & get
recommendations!
Published in 2023 at "IEEE Access"

DOI: 10.1109/access.2023.3245825

Abstract: The unrelated parallel machine scheduling problem with sequence dependent setup times (UPMSP-SDST) addressed in this study refers to allocating jobs among a given number of machines and determining their processing sequence on each machine, to… read more here.

Keywords: machine scheduling; machine; parallel machine; sequence ... See more keywords
Photo from wikipedia

Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times

Sign Up to like & get
recommendations!
Published in 2018 at "PLoS ONE"

DOI: 10.1371/journal.pone.0200030

Abstract: This paper addresses the problem of makespan minimization on unrelated parallel machines with sequence dependent setup times. The symbiotic organisms search (SOS) algorithm is a new and popular global optimization technique that has received wide… read more here.

Keywords: machine; sos algorithm; parallel machines; unrelated parallel ... See more keywords
Photo by cokdewisnu from unsplash

Unrelated Parallel Machine Scheduling with Job and Machine Acceptance and Renewable Resource Allocation

Sign Up to like & get
recommendations!
Published in 2022 at "Algorithms"

DOI: 10.3390/a15110433

Abstract: In this paper, an unrelated parallel machine scheduling problem with job (product) and machine acceptance and renewable resource constraints was considered. The main idea of this research was to establish a production facility without (or… read more here.

Keywords: machine scheduling; job; machine; parallel machine ... See more keywords
Photo by cokdewisnu from unsplash

A Novel Shuffled Frog-Leaping Algorithm for Unrelated Parallel Machine Scheduling with Deteriorating Maintenance and Setup Time

Sign Up to like & get
recommendations!
Published in 2021 at "Symmetry"

DOI: 10.3390/sym13091574

Abstract: Unrelated parallel machine scheduling problems (UPMSP) with various processing constraints have been considered fully; however, a UPMSP with deteriorating preventive maintenance (PM) and sequence-dependent setup time (SDST) is seldom considered. In this study, a new… read more here.

Keywords: parallel machine; machine scheduling; unrelated parallel; frog leaping ... See more keywords
Photo from wikipedia

A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling

Sign Up to like & get
recommendations!
Published in 2022 at "PeerJ Computer Science"

DOI: 10.7717/peerj-cs.844

Abstract: In many countries, there is an energy pricing policy that varies according to the time-of-use. In this context, it is financially advantageous for the industries to plan their production considering this policy. This article introduces… read more here.

Keywords: time use; time; formulation; parallel machine ... See more keywords