Sign Up to like & get
recommendations!
1
Published in 2022 at "Journal of the Operational Research Society"
DOI: 10.1080/01605682.2022.2039569
Abstract: Abstract We propose four algorithms for the no-wait flow shop scheduling problem. The objective is minimizing total completion time such that makespan is not greater than a maximum value. We address the problem with sequence-dependent…
read more here.
Keywords:
wait flow;
completion time;
sequence dependent;
setup times ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2019 at "Engineering Optimization"
DOI: 10.1080/0305215x.2018.1485903
Abstract: ABSTRACT In this article, the impact of preventive maintenance policies on the constructive heuristics performance for the no-wait flow-shop problem with total flow-time minimization is evaluated. The main constructive heuristics for the m-machine no-wait flow-shop…
read more here.
Keywords:
flow shop;
total flow;
wait flow;
flow time ... See more keywords
Sign Up to like & get
recommendations!
2
Published in 2023 at "IEEE Transactions on Industrial Informatics"
DOI: 10.1109/tii.2022.3192881
Abstract: This article investigates a distributed assembly no-wait flow-shop scheduling problem (DANWFSP), which has important applications in manufacturing systems. The objective is to minimize the total flowtime. A mixed-integer linear programming model of DANWFSP with total…
read more here.
Keywords:
problem;
wait flow;
algorithm;
distributed assembly ... See more keywords