Articles with "wait flowshop" as a keyword



Photo by jontyson from unsplash

An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time

Sign Up to like & get
recommendations!
Published in 2020 at "Engineering Optimization"

DOI: 10.1080/0305215x.2020.1797000

Abstract: This article addresses the m-machine no-wait flowshop scheduling problem with the objective of minimizing makespan subject to an upper bound on total completion time. An iterated greedy-with-local-search algorithm is proposed and compared with a mathematical… read more here.

Keywords: time; makespan subject; problem; flowshop scheduling ... See more keywords
Photo by theblowup from unsplash

A Matheuristic Approach for the No-Wait Flowshop Scheduling Problem with Makespan Criterion

Sign Up to like & get
recommendations!
Published in 2022 at "Symmetry"

DOI: 10.3390/sym14050913

Abstract: The No-wait Flowshop Scheduling Problem (NWFSP) has always been a research hotspot because of its importance in various industries. This paper uses a matheuristic approach that combines exact and heuristic algorithms to solve it with… read more here.

Keywords: problem; scheduling problem; matheuristic approach; flowshop scheduling ... See more keywords