Articles with "way calculate" as a keyword



Photo from wikipedia

A new way to calculate productivity of five-spot pattern at high water cut stages

Sign Up to like & get
recommendations!
Published in 2018 at "Journal of Petroleum Exploration and Production Technology"

DOI: 10.1007/s13202-018-0607-4

Abstract: This paper presents a new way to calculate productivity of five-spot pattern at high water cut stages. In low permeability reservoirs, it is difficult for the reservoir fluid to flow, and the recovery factor is… read more here.

Keywords: five spot; productivity; new way; calculate productivity ... See more keywords