Sign Up to like & get
recommendations!
0
Published in 2021 at "Ecological Indicators"
DOI: 10.1016/j.ecolind.2020.107019
Abstract: Abstract The environmental flow requirement varies from project to project based on their location, need, and habitat. The Binwa hydropower project is in the Kangra district of the Himachal Pradesh and a small hydropower project…
read more here.
Keywords:
wetted perimeter;
flow requirement;
environmental flow;
flow ... See more keywords