Published in 2020 at "International Journal of Production Research"
DOI: 10.1080/00207543.2019.1634297
Abstract: An important goal of Production Planning and Control systems is to achieve short and predictable flow times, especially where high flexibility in meeting customer demand is required, while maintaining high output and due-date performance. One…
read more here.
Keywords:
workload control;
control;
optimization;
simulation ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2020 at "International Journal of Production Research"
DOI: 10.1080/00207543.2020.1735667
Abstract: Most manufacturing shops in practice have limited physical space in front of each workstation, due, for example, to physical, economical or operational constraints. As a result, a job may cause blocking because it has to…
read more here.
Keywords:
order release;
control order;
workload;
workload control ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2020 at "International Journal of Production Research"
DOI: 10.1080/00207543.2020.1797208
Abstract: An essential task in manufacturing planning and control is to determine when to release orders to the shop floor. A prominent approach is the workload control (WLC) concept which originated from the idea of controlling…
read more here.
Keywords:
semiconductor manufacturing;
rule;
workload control;
rule based ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2023 at "Applied Sciences"
DOI: 10.3390/app13085210
Abstract: The reduction in emissions and the increase in energy costs push companies to identify solutions to reduce energy consumption in production systems. One of the approaches proposed in the literature is the shutdown of machines…
read more here.
Keywords:
energy consumption;
switch policies;
policies job;
workload control ... See more keywords